I need a solution
Hi there,
I am planning to have a Quantum Superloader 3 installed at our office. I have a question on the operational side.
Can I assign different tapes to different jobs that would run on the same day.
I need to segregate the data on the tapes: i.e. tape 1 - for job 1 - for server 1, tape 2 - job 2 - for server 2, etc. The loader should remove tape 1 and load tape 2 for job 2 etc.
Your feedback is appreciated,
Thank you,
Manfred