I need a solution
Hi,
I have a BE12.5 server in a branch office. When the weekly job runs, it doesnt get completed and the tape ejects automatically. So when i see the status of the job, it says the following:-
Completed status: Canceled, timed out The job was automatically canceled because it exceeded the job's maximum configured run time. |
How do i configure the job so that it completes the write operation to tape.
Thanks,