I need a solution
We run a full LAN backup job each night. The tape device pool for this job consists of 6 tape drives, with each nightly job comprising 3 tapes. I've noticed that if I do not pull the tapes on a given night, the following night's job may overwrite one of the previous night's tapes even though there are 3 other tapes available. Is there a way to keep this from occuring and for the job to utilize tapes that were not written to the previous night?