I need a solution
Hi!
Isn't it possible to run two or more jobs simultaneously for the same storage in BE 2012? If not then what is the correct procedure for it?
Thanks.
Hi!
Isn't it possible to run two or more jobs simultaneously for the same storage in BE 2012? If not then what is the correct procedure for it?
Thanks.