I need a solution
My boss wants me to change the number of days that the GRT data for Exchange 2K10 can be overwritten to 3 - vs whatever it is right now.
I'm not 100% up on the GRT aspect for exchange server - but know enough to set up that part.
Can anyone point me in the right direction? It's probably something very obvious.
THANKS!
Cory