Hi
Is it possible in Backup Exec 2012, to get a full backup job to run on a diffenrent date then scheduled for 1 or 2 specific dates?
My setup is this:
Every friday night I'm running a full backup, Mondag to Thursday I'm running af differential backup. First I do it to disk, and when that's done a linked job is started which do the same backup to tape. New tape very day, switched by hand.
I my country we have a national holiday next Friday, which means that no one are at the office, so the tape from Thursday can be switched, and I will not get a full backup for that week.
Is there someway, I can set it up to understand that on specfic dates, the full backup should be executeted on Fridays, but Thursdays instead?
I'm not found about switching it manually before and after each date, cause we got a lot at jobs, and the possiblility that we miss something is likely.
Regards
Lars